The reconstruction of AEL F.C. Arena became true!
The reconstruction of AEL F.C. Arena was completed successfully, even though the football pitch was in a very bad condition.
The reliability and the expertise of our company were the selection criteria for this very difficult project, as the stadium had to be delivered, for the first use, within a strict timetable.
The works that took place in the pitch were the replacement of the damaged lawn and of the inappropriate soil substrate, the creation of a new, modern drainage system and the replacement the old sod with the new sod of “Dias" variety, the Bermuda hybrid Tifway 419.
Although there was a tight timeframe for completing the work on the field, Hellasod did the most thorough and accomplished the task promptly and qualitatively.
The reliability and the expertise of our company were the selection criteria for this very difficult project, as the stadium had to be delivered, for the first use, within a strict timetable.
The works that took place in the pitch were the replacement of the damaged lawn and of the inappropriate soil substrate, the creation of a new, modern drainage system and the replacement the old sod with the new sod of “Dias" variety, the Bermuda hybrid Tifway 419.
Although there was a tight timeframe for completing the work on the field, Hellasod did the most thorough and accomplished the task promptly and qualitatively.